Förstudie: Akademisk fordonsdynamiklab
Diarienummer | |
Koordinator | LINDHOLMEN SCIENCE PARK AKTIEBOLAG - Test Site Sweden |
Bidrag från Vinnova | 140 000 kronor |
Projektets löptid | april 2012 - oktober 2012 |
Status | Avslutat |
Syfte och mål
The objective was to define the facilities required at the academy, to enable an efficient use of the Swedish national complete vehicle test environments (e.g. ASTA). This was fulfilled, to the level of equipment lists.
Resultat och förväntade effekter
The project was presented at a final meeting with TSS, 20121016. TSS promised to come back with a possible proposal of a common next step, typically by end of November 2012.
Upplägg och genomförande
The project was mainly an information collecting project. The information was collected in a common data storage. Regular meetings was held in the Chalmers Team. Interview meetings with other research groups, initially at Chalmers and in the end of project with KTH and LTU. The specification was driven to as concrete level as possible, which is viewed in the Equipment list. The separation into generic, shared (largeinvestment) and site specific made it possible to discuss and agree on a relatively detailed level. It was decide to include also sketches of (site specific) project lists.