Syfte och mål

The objective was to define the facilities required at the academy, to enable an efficient use of the Swedish national complete vehicle test environments (e.g. ASTA). This was fulfilled, to the level of equipment lists.

Resultat och förväntade effekter

The project was presented at a final meeting with TSS, 20121016. TSS promised to come back with a possible proposal of a common next step, typically by end of November 2012.

Upplägg och genomförande

The project was mainly an information collecting project. The information was collected in a common data storage. Regular meetings was held in the Chalmers Team. Interview meetings with other research groups, initially at Chalmers and in the end of project with KTH and LTU. The specification was driven to as concrete level as possible, which is viewed in the Equipment list. The separation into generic, shared (largeinvestment) and site specific made it possible to discuss and agree on a relatively detailed level. It was decide to include also sketches of (site specific) project lists.