Purpose and goal

The project has through the activities carried out in the subprojects as well as through the industry day achieved its purpose and targets. The final report concludes the three subprojects. In the results from the subprojects there are input for the creation of a national collaboration and for defining target areas, roles, methods for knowledge sharing and national and international collaboration. Finally, as a first step to reach an increased collaboration and an increased co-ordination between initiatives and actors, recommendations are directed to a number of industry actors.

Expected results and effects

Subproject 1 has resulted in prioritized sustainability focus areas with connected actions. Subproject 2 has resulted in an example of a possible structure for sharing of information, and in a description of suggested roles and forms for increased collaboration. Subproject 3 has resulted in a an updated mapping of sustainability schemes for the infrastructure sector and the possibilities and challenges linked to the new version the CEEQUAL manual. Subproject 3 has also resulted in a suggestion for future steps the Swedish market should take to make the most out of the use of CEEQUAL.

Planned approach and implementation

The project was conducted in the form of three subprojects and an industry summit Construction Climate Challenge Summit (CCC-Summit) the 18th of June 2018. The final report is a conclusion of the three subprojects where the subprojects commonly have given the results and the conclusions presented in chapter 3 in the final report.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 4 January 2019