Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Injure-preventive composite pavement made by rubber-modified cement-based concrete

Reference number
Coordinator CBI Betonginstitutet AB - CBI Betonginstitutet AB - Stockholm
Funding from Vinnova SEK 50 000
Project duration December 2014 - February 2015
Status Completed

Purpose and goal

By means of complementary funding the innovation concerns the development of a fall-preventive composite pavement, composed of a rubber-modified cement-based concrete. The main task of this particular project deals with the construction of a 50 m long testpath for bikes and the documentation of its construction, as well as the planning for the validation of its properties. The project has been sucessfully completed.

Results and expected effects

The construction of a 50 m long composite test-pavement and the documentation of its construction are conducted. Planning for new means for the evaluation of the pavements unique properties are now undertaken. We expect that this new type of pavement for bicycle paths will meet the demands to decrease injuries among cyclists.

Approach and implementation

1. Planning for the construction of a testpavement for cyclists. 2. The construction of the testpath (preparations before the casting, mixing, casting och post-treatments). 3. Documentation and further planning for the evaluation of the testpath´s properties.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 November 2019

Reference number 2014-06122

Page statistics