Incineration of sewage sludge and waste with subsequent phosphorus recovery

Reference number
Coordinator LIDKÖPINGS VÄRMEVERK AKTIEBOLAG
Funding from Vinnova SEK 176 500
Project duration September 2014 - July 2015
Status Completed

Purpose and goal

The aim of the project was to see if there are conditions for Lidköping Thermal to be able to handle and burn sludge fuel mixture and obtain most of the phosphorus in a recoverable ash fraction. This purpose is fulfilled.

Results and expected effects

The result was that 70 % of the phosphorus ended up in the cyclone ash. The phosphorus content of this ash was 2.3 %. This phosphorus is technically possible to extract. To get further and investigate whether the Lidköping Thermal can deploy this co-incineration on a full scale deeper and further studies must be done.

Approach and implementation

Project implementation was postponed for 2 rounds. The reason for the first delay was a problem with slurry fuel mixture and the second that the coordinator of the project had to be replaced during the project time.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.