Important results from the project
The purpose of the project and the overall goal was to develop and concretize the described the idea of the automatic emptying registration, and to develop a basis for a development project . This goal has been met in the project and there is now a developed and concretized idea and the basis for a development project. All four decomposed milestones to achieve the overall goal was reached successfully .
Expected long term effects
The concrete results expected from the project were in form of five deliveries : - A concept to proceed with. - An overall specification of the technical equipment required in the trucks. - A comprehensive specification of requirements for software and its integration with the vehicle´s technical equipment. - Full picture of the costs of implement the solution, how it can be done and what the consequences are. - A project plan, project group, cost estimates and a financing plan. At the end of the project can be concluded that all five results available
Approach and implementation
The project was structured in five work packages: AP1 : Concept Design AP2 : Requirements for technical equipment AP3 : Software requirements AP4 : Investigation of consequences of introducing the solution AP5 : Planning of a development project For each work package, there were a number of activities specified that more precisely described the work to be performed within the work package. The project was conducted according to these work packages/activities without major deviations and the final deliveries met the expectations set.