BRAVE -- Boost contRol of Advanced Valve Train Engines
Reference number | |
Coordinator | Scania CV Aktiebolag - Avd NEPP |
Funding from Vinnova | SEK 2 300 000 |
Project duration | April 2017 - December 2018 |
Status | Completed |
Venture | Electronics, software and communication - FFI |
Call | 2016-04638-en |
End-of-project report | 2016-05399sv.pdf(pdf, 279 kB) (In Swedish) |
Important results from the project
Purpose and goal of the project have been to further strengthen the well established collaboration that exist between Scania and the group for vehicular systems at Linköping university and develop understanding for how a modular control system architecture should be to be able to handle increased complexity and subsystem limitations in an efficient manner. Both these goals are considered as well met with for example the project leader getting a part time position at the university and the 5 publications that have been produced in the project.
Expected long term effects
The assessment of the steering group is that the project has satisfied the expected results more than well and has remaining effects beyond the project in the form of the part time position of the project leader at the university.
Approach and implementation
The majority of the project work has been conducted as master´s theses and/or resulted in conference papers in line with good research practice.