Smart CCI Label #2

Reference number
Coordinator TEMPERATURE SENSITIVE SOLUTIONS SYSTEMS SWEDEN AB
Funding from Vinnova SEK 3 766 979
Project duration August 2017 - December 2019
Status Completed
Venture The strategic innovation programme Electronic Components and Systems:

Purpose and goal

The project has developed a temperature logger (smart label) for temperature monitoring within the pharmaceutical supply chain. The purpose of the project was to verify that the technology is robust and scalable. But also to verify the market need and to transfer the technology to a product owner. The project has demonstrated that the product has been able to be industrialized and that these units also have a higher robustness and performance than before. Furthermore, the market needs have been validated and the project´s overall assessment shows good potential for the product.

Expected results and effects

The positive project result shows that many of the expected results were met. The most obvious was the outcome for simulation of serial production as well as the continuous transfer of knowledge to product owners conducted during the project. Several, partly unforeseen, technical challenges emerged during the course of the project, including increasing the physical flexibility of the label as well as maintaining its original size. The verification of the market need was, in many respects, expected with the addition of an increased understanding of the increasingly price pressure.

Planned approach and implementation

The project used an agile method with an iterative development approach with the exception of certain parts within the production line. The project team had scheduled follow-up meeting once a week to follow up on deliverables and potential challenges/risks. Furthermore, joint workshops and physical meetings were organized as needed. The chosen method and method of assessment were considered good considering the results of the project. Further analysis indicates that the project could have established more sub-goals to keep track on the overall project goals.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 13 March 2020