Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

MLOC+

Reference number
Coordinator IGW EUROPE AB - IGW EUROPE, Kista
Funding from Vinnova SEK 2 977 000
Project duration August 2016 - January 2018
Status Completed
Venture The strategic innovation programme for Swedish mining and metal producing industry - SIP Swedish Mining Innovation

Purpose and goal

The project has met most of the goals, Partly achieved is only P2-Local clouds. All the other goals are considered achieved. We have developed an improved “mass-localisation” that is ready to be deployed at customer sites for testing. New software and hardware and an improved positioning algorithms has been developed. We have conducted 9 months of testing in the Boldien Kriberg mine.

Expected results and effects

A long term tested stable system: Achieved Improved positioning: Achived A system at planned TRL-level deployed at customer site: Achieved.

Planned approach and implementation

It is very time consuming to run tests in the actual mine. The time for testing in the mine should be minimized by utilising local tests as much as possible. However, the most important is the actual testing in the mine! Important to also be able to monitor and improve the system remotely.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 November 2019

Reference number 2016-02618

Page statistics