Important results from the project

The project has met most of the goals, Partly achieved is only P2-Local clouds. All the other goals are considered achieved. We have developed an improved “mass-localisation” that is ready to be deployed at customer sites for testing. New software and hardware and an improved positioning algorithms has been developed. We have conducted 9 months of testing in the Boldien Kriberg mine.

Expected long term effects

A long term tested stable system: Achieved Improved positioning: Achived A system at planned TRL-level deployed at customer site: Achieved.

Approach and implementation

It is very time consuming to run tests in the actual mine. The time for testing in the mine should be minimized by utilising local tests as much as possible. However, the most important is the actual testing in the mine! Important to also be able to monitor and improve the system remotely.