Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Implementing a new load unit in a present technological context

Reference number
Coordinator CHALMERS TEKNISKA HÖGSKOLA AKTIEBOLAG - Institutionen för teknikens ekonomi och organisation
Funding from Vinnova SEK 370 808
Project duration September 2013 - May 2014
Status Completed
Venture Transport Efficiency
End-of-project report 2013-02629 Imp Lastbärare sv.pdf(pdf, 655 kB) (In Swedish)

Purpose and goal

The aim has been to continue development of a load carrier that can contribute to more efficient supply chains. Sub-targets have been: (1) Enhance the load carrier prototype, (2) Demonstrate the technical design of the new load carrier concept, (3) Identify potential for introduction of a new load carrier in a supply chain, (4) Show how the developed technology can support process development via efficiency improvement through new services based on the new load carrier, improved traceability and exchange of information, and quality improvement in the forest raw material.

Results and expected effects

An important result is the interaction that has developed between the industrial partners. This is especially important in a pre-study that aims for a future collaboration in a main study. Another result is the technological development that has resulted from workshops and tests. A number of opportunities and challenges have been identified, which, in turn, have led to the generation of research questions for a main study. All in all, the pre-study has meant that some SMEs have started to collaborate which can lead to the development of various business concepts.

Approach and implementation

To fulfill the purpose of the study the work was divided into two work packages. The first aimed to describe and develop the load carrier further. Various technological development proposals have been discussed and appraised during a number of workshops. A trial has been conducted in which the load carrier has been used in a real situation in order to test the load carrier and identify possible improvements. The second work package creates an understanding of the present situation and how the load carrier would fit into the existing forestry supply chain.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 November 2019

Reference number 2013-02629

Page statistics