Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Cistern free WC

Reference number
Coordinator CDUP AB
Funding from Vinnova SEK 164 000
Project duration August 2013 - March 2014
Status Completed

Purpose and goal

This planning project was initiated to (1) make a market analysis to verify the market demands about the properties that the product Buttler can offer, and (2) verify with a first prototype that the technology is working and to identify the gaps. (1) Market analysis confirm our thoughts and identify different needs for different stage of development in some national economies. (2) Laboratory tests confirm that the technology work. Gaps are identified.

Results and expected effects

The vortex and trap design proves to work. We learn that the volume of the trapped water in the seal make difference and development should reduce the seal by 20% for our product Buttler. Naturally the supplied water flow makes difference and eventhough the tests were performed at normal condition with community tap water, further technical development must drive the design towards higher performance at less water flows.

Approach and implementation

Most workflows such as patent service, market analysis and project management were performed locally in city of Västerås, Sweden. Exceptions were the computer design (Stockholm), flow analysis (Gothenburg) and manufacturing of the protoype (Nanjing China). The project followed very well the plan however with the following adjustments. New computer flow simulations were done based of the completed 3D drawings. The prototype was split in three pieces to gain flexibility in different parameters. Delivery of prototype was from China.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 November 2019

Reference number 2013-03172

Page statistics