Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

FleetBalance

Reference number
Coordinator Gridlynx AB
Funding from Vinnova SEK 300 000
Project duration November 2022 - November 2023
Status Completed
Venture Innovative Startups
Call Innovative Impact Startups autumn 2022

Important results from the project

With an increasing share of renewable energy sources (wind power, solar power) in the electric power system, the connected rotating mass is decreasing. This increases the likelihood and risk of large variations of the power system frequency. The purpose and goal of the project have been to develop a solution for fleets of trains to target this challenge and to take this solution closer to the market. The project has made it possible for us to develop the solution. We now co-operate with a potential customer to test drive a first implementation of the solution.

Expected long term effects

For Gridlynx an important result of the project has been to start co-operation with a train operator to test a first implementation of the solution. A market analysis of the market potential in Europe has been performed. The project has made it possible for us to develop an IT platform to deliver our service. The platform i still under development.

Approach and implementation

The project has followed the planned work packages: WP1: Co-operation with train operator. WP2: Co-operation with TSO. WP3: Develop IT platform. WP4: Simulation, optimization. WP5: Business development. WP6: Sustainability and gender equality strategy.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 9 December 2023

Reference number 2022-02318