Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

Fleeet: Production Automation – From Successful Pilot to Strategic Talks with Amazon´s Tech Leadership

Reference number
Coordinator Banjouli AB
Funding from Vinnova SEK 500 000
Project duration November 2025 - May 2026
Status Completed
Venture Innovative Startups
Call Innovative Startups 2025

Important results from the project

The project achieved its central objective. Fleeet ecosystem is working and the POC with Amazon MGM Studios was carried out according to plan. The Amazon relationship developed deeper than expected with ongoing dialogue about paid upcoming productions. In parallel, we are now delivering to Movistar+ (feature film "Patagonia", full list price) and are negotiating the final phase of long-term SaaS delivery to Instituto Costaricense de Turismo. The commercial willingness to pay is thus proven.

Expected long term effects

Vinnova created the conditions for Banjouli to establish Fleeet as a European, sustainable standard for "first mile" in global film production. Short term: convert the Amazon pipeline to paid assignments and secure the ICT agreement. Medium term: scale the SaaS offering to more distributors (Banijay, MediaPro), reduce the number of air transports of hard drives in the industry and significantly reduce the CO₂ load from production logistics. The foundation for a seed round has been laid

Approach and implementation

The project was run in three work packages. AP1 (Nov-Feb) built the central API, authentication and backend. AP2 (Feb-Apr) integrated the desktop agent, Rushes Engine and HiveLink hardware, and ran end-to-end tests. AP3 (Apr-May) carried out the POC at Amazon MGM Studios filming and collected KPIs. The schedule was followed. Agile sprints with weekly follow-ups. Roles: Rodrigo PM/product owner, Klas CTO, and selected consultants. In parallel the Spanish partner channel grew unexpectedly strongly

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 6 June 2026

Reference number 2025-02835