Digital Material and Waste Management Plan to take circular construction from pilots to scalable system solution.

Reference number
Coordinator Collecct AB
Funding from Vinnova SEK 500 000
Project duration October 2025 - May 2026
Status Completed
Venture Innovative Startups
Call Innovative Startups 2025

Important results from the project

The project aimed to develop a user-friendly digital material and waste management plan to enable more data-driven and circular handling of residual materials in construction and real estate projects. The objective was largely achieved through needs analysis, process design, prototyping, and validation in realistic user scenarios. The project generated important insights into how the solution can support requirements-setting, follow-up, and scaling from individual projects to portfolio level.

Expected long term effects

In the long term, the project is expected to help make circular construction more measurable, comparable, and scalable. Better digital support for requirements-setting, traceability, and follow-up can give property owners and contractors greater control over residual material flows. This may lead to increased reuse, higher recycling rates, reduced waste, and improved sustainability reporting. For Collecct, the results support continued development and commercialization.

Approach and implementation

The project was carried out largely according to plan, including needs analysis, stakeholder dialogue, process design, prototype development, and validation in realistic user scenarios. The approach created a clear link between customer needs and technical development. Some resource changes caused certain activities to take slightly longer and limited customer validation, but the project was completed with good quality and a clear result as a basis for further development.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 26 June 2026

Reference number 2025-02183