| Reference number |
2026-01387 |
| Coordinator |
Svensk Elektronik Service AB |
| Funding from Vinnova |
SEK 25 000 |
| Project duration |
May 2026 - May 2026
|
| Status |
Completed |
| Call |
Travel grant Vinnova 2026 |
Important results from the project
The project met its objectives and the delegation trip yielded strong results. Contacts and insights from the meetings, especially with KSIA, have created a solid foundation for continued cooperation and new bilateral opportunities. The project has also generated valuable networks, spin-off effects and long-term opportunities for Sweden in semiconductors, SME development and international partnerships.
Expected long term effects
The results strengthen Sweden´s international position in semiconductors and open up for increased innovation and industrial capacity through future collaborations with Korean actors. The contacts create new opportunities for Swedish SMEs, deepen EU–Korea–Sweden cooperation and contribute to more robust and diversified value chains.
Approach and implementation
The project was implemented according to plan with the right activities and a well-functioning collaboration. The delegation trip gave the results that were expected and developed as intended. The schedule could be followed and no major external obstacles arose. The established contacts and insights strengthen the project´s continued work and future direction.
The project description has been provided by the project members themselves and the text has not been looked at by our editors.