Important results from the project
The trip to the LeadIT ITP Cluster Workshops in New Delhi 5–8 October 2026 largely yielded the planned results. EcoTech presented its part of a feasibility study on carbon dioxide capture at an Indian cement plant, together with IIT Bombay and Ambuja Cements, and the collaboration with the partners was deepened. The delivery of plant data remains, and a joint pilot requires the results of the feasibility study.
Expected long term effects
In the long term, the feasibility study can show how renewable electricity and battery storage can provide carbon capture in the cement industry at a reasonable cost. If the results are positive, they can form the basis for a joint pilot in India. The experiences are also relevant for the electrification of Swedish industry.
Approach and implementation
I New Delhi participated in EcoTech´s Milestone check with a project presentation, the cement sector workshop, LeadIT ITP´s official workshop and EPD Internationals conference, as well as in project meetings with the partners. The Swedish Energy Agency was responsible for the set-up and Business Sweden for the logistics on site. The activities were relevant, the schedule was met and the collaboration worked well.