Streamlining the dew point condensation
Reference number | |
Coordinator | Picoterm AB |
Funding from Vinnova | SEK 300 000 |
Project duration | October 2012 - June 2013 |
Status | Completed |
Important results from the project
The aim of the project was to show that energy consumption in water production with Picoterm´s innovation is less than competing technologies. By saving energy, and its simple design show that innovation is commercially viable in water production. The target could not be met on time because of sealing problems in the mechanical design.
Expected long term effects
By objective was not achieved, Picoterm immediately started work to overcome the mechanical problem. It is vital that the mechanical problem is solved to obtain an interest in multinationals company and thereby reach out to the international water market
Approach and implementation
Together with AlfaLval and SP a project plan was put together. The plan was carried out until the mechanical problem appeared. Now the company is working with an alternative plan to deal with the mechanical problem.