Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Strategic technologies for bulk power transmission

Reference number
Coordinator Kungliga Tekniska Högskolan - Kungliga Tekniska Högskolan Inst för elektroteknik
Funding from Vinnova SEK 1 470 000
Project duration November 2025 - March 2026
Status Completed
Venture Cluster of Excellence for Cutting-Edge Technologies - calls for proposals
Call Visions for world-leading research and innovation in strategic technology areas

Important results from the project

The project itself led to the desired results, i.e. the project objectives were achieved. The strategic purpose of the project, i.e. to establish a cluster of excellence in an area strategic to Sweden, was not achieved, since the conditions for establishing a cluster of excellence changed during the project period. It has become clear during the course of the work that the issues that the project has worked on have too high a technical maturity to be relevant in the establishment of a cluster.

Expected long term effects

An increased understanding of the importance of national cooperation in the field of electric power engineering to support Swedish industry, as a contrast to small-scale calls for proposals by various authorities guided by political priorities.

Approach and implementation

The project was run by a project group where all actors were represented. The group met weekly and prioritized the upcoming week´s activities, which were distributed across the actors. For larger efforts, web pages, workshops and reporting, a smaller working group was put together, which reported to the project group.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 19 May 2026

Reference number 2025-03235