SORLEG4FOOD: Sorghum-Legume Innovation Systems for Climate Resilience, Nutrition and Inclusive Agri-Food Markets in Africa and Europe

Reference number
Coordinator Sveriges Lantbruksuniversitet - Sveriges Lantbruksuniversitet SLU Institutionen för växtförädling
Funding from Vinnova SEK 499 951
Project duration December 2025 - July 2026
Status Completed
Venture Global cooperation 2025
Call Planning grant for international proposal 2025

Important results from the project

SORLEG4FOOD aimed at developing a winning Horizon Europe-application within AU-EU FNSSA-call (HORIZON-CL6-2027-02-FARM2FORK). The project was coordinated by the Swedish University of Agricultural Sciences (SLU) with partners from Sweden, Germany, Spain, Lithuania, Sudan, South Africa, Botswana, Niger and Morocco. The grant contributed substantially to coordination, partner mobilization and professional application writing, but did not result in EU funding (13,5 out of 15 points were obtained).

Expected long term effects

The absolute goal of this project was to form a strong consortium to win a project within the 2027 AU-EU FNSSA-utlysning (HORIZON-CL6-2027-02-FARM2FORK). The expected results and impacts were to contribute to long-term impacts on European and African climate-adapted and nutritionally secure food systems. As EU-funding from the intended call for proposals was not obtained, the long-term impacts will be postponed pending the project receiving funding in another call for proposals.

Approach and implementation

The work was carried out as planned (plan below), although the work was intensified (150% Dec-Apr), as the application deadline expired earlier than planned (April 14). Work package 1 management and organization Work package 2 (Dec 2025 - Jan 2026), formalization of partners and roles Work package 3 (Feb - April 2026), work packages formulated and written Work package 4 (March - May 2026), gender equality, impact and dissemination written Work package 5 (May - June 2026), completion of proposal

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 4 September 2026

Reference number 2025-04555