Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Smart digital twin for the future energyoptimized fossilfree travel

Reference number
Coordinator Swedavia AB - Swedavia AB Stockholm Arlanda Airport
Funding from Vinnova SEK 3 161 400
Project duration October 2023 - December 2025
Status Ongoing
Venture Advanced digitalization - Enabling technologies
Call Advanced and innovative digitalization 2023 - call two

Purpose and goal

The idea of the project is to develop an intelligent AI-based digital twin to explore the optimization of energy consumption and energy storage, to future-proof the electrification of the airport, the vehicle fleet, and fossil-free travel. For example, real-time data and predictions about passenger numbers will be used in the digital twin to optimize lighting control and the terminals´ air conditioning. Data from flight operations systems can control how and when aircraft are heated, and data from parking customers can be used to control when parked electric cars are charged.

Expected effects and result

The project´s objective is to develop knowledge and competence in advanced digitalization linked to smart digital twins in the area of energy optimization and how this can be solved in the future. The project also aims to produce a demo solution of a digital twin for selected parts of Arlanda. The digital twin will combine rule-based AI and machine learning to analyze large amounts of data from various sensors to find ways to control, optimize, and streamline energy use.

Planned approach and implementation

The project is a collaboration between Uppsala Universitet and Swedavia AB and is planned to last for 20 months from November 2023 until June 2025. Swedavia is the owner of the requirements and project manager of the project. Uppsala Universitet will develop AI models for the digital twin. The project starts at TRL 4 and hopes to create a demonstration solution to reach TRL 6 by the end of the project at Stockholm-Arlanda airport. Swedavia plans continuous follow-up meetings and working meetings with Uppsala Universitet during the project period.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 28 November 2023

Reference number 2023-01893