Roadmap Färingsö - Preparation Project
| Reference number | |
| Coordinator | Sustainable Innovation i Sverige AB |
| Funding from Vinnova | SEK 717 500 |
| Project duration | June 2025 - May 2026 |
| Status | Completed |
| Venture | Accelerate - FFI |
| Call | FFI Accelerera the transition to sustainable road transport - spring 2025 |
Important results from the project
The objectives were met by verifying the conditions for a potential system demonstration on Färingsö. The project has clarified the technology’s opportunities and limitations, technical maturity is expected within approx 12 months, and identified needs for physical and digital infrastructure as well as requirements for operations and permits. An important result is a stronger basis for continued market dialogue, procurement and strategic choices for autonomous public transport in rural areas.
Expected long term effects
In the long term, the project is expected to contribute to more accessible, flexible and socially beneficial public transport in rural areas. The results can pave the way for system demonstrations with electrified and autonomous vehicles, reduce dependence on private cars, and provide a stronger basis for future procurements, permit processes and digital services. The lessons learned can also be scaled to other municipalities and regions in the EU with similar transport challenges.
Approach and implementation
The work included technology and market analysis, supplier dialogues, traffic design, DRT/digital integration, permits, operations and physical infrastructure. The project developed largely according to plan, except that the RFI and planning of the system demonstrator could not be completed in full due to the immaturity of the technology. Some elements will be completed in the next step. Collaboration between the partners worked well and was crucial to the results.