Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Resilient and reliable power supply

Reference number
Coordinator SeaPattern Sweden AB
Funding from Vinnova SEK 1 300 000
Project duration October 2024 - July 2025
Status Ongoing
Venture Civil-military synergies
Call Acceleration of Civil-Military Innovations 2024

Purpose and goal

The project aims to address the increasing vulnerability that arises in step with the increasingly rapid electrification and digitalization of the Armed Forces and society. This project aims to develop and implement a pilot together with the Swedish Armed Forces, where we demonstrate mobile, small-scale and resilient hydropower turbines that can ensure a safe and independent electricity supply for military equipment.

Expected effects and result

Established requirements specification for military variant of a hydrokinetic electrical system; manufacture, produce equipment and demonstration in the field for the armed forces

Planned approach and implementation

Work package 1: Determine requirements specification; manufacture, produce a hydrokinetic electrical system Work package 2: Demonstration in the field for the armed forces

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 5 November 2024

Reference number 2024-03321