Purpose and goal
The project aims to address the increasing vulnerability that arises in step with the increasingly rapid electrification and digitalization of the Armed Forces and society.
This project aims to develop and implement a pilot together with the Swedish Armed Forces, where we demonstrate mobile, small-scale and resilient hydropower turbines that can ensure a safe and independent electricity supply for military equipment.
Expected effects and result
Established requirements specification for military variant of a hydrokinetic electrical system; manufacture, produce equipment and demonstration in the field for the armed forces
Planned approach and implementation
Work package 1: Determine requirements specification; manufacture, produce a hydrokinetic electrical system
Work package 2: Demonstration in the field for the armed forces
The project description has been provided by the project members themselves and the text has not been looked at by our editors.