RES-UPP – RESilient Supply Chains and Production Ramp-Up with Simulation and AI

Reference number
Coordinator Evoma AB
Funding from Vinnova SEK 951 375
Project duration November 2025 - September 2026
Status Completed
Venture Civil-military synergies
Call Acceleration of civil-military innovations by 2025

Important results from the project

RES-UPP developed and demonstrated an automated method for long-term planning of maintenance, production and supply capacity under changing demand. The solution combines multi-objective optimisation, simulation and interactive visualisation. It was tested with synthetic data in a defence-related maintenance case involving changing demand and disruptions. The main objectives were largely achieved, while validation with operational data remains a next step.

Expected long term effects

In the longer term, the results may support better decisions on when to expand capacity, skills and supply capabilities. The method can reduce the risk of both capacity shortages and premature investment by making trade-offs between cost, operational capability and robustness visible. The reusable planning workflow and dashboard can be further developed for civil and defence-related applications in maintenance, production, logistics and resilience planning.

Approach and implementation

The project was carried out iteratively through needs analysis, reference group engagement, modelling, multi-objective optimisation, simulation and development of an interactive dashboard. When technical integration proved more extensive than expected, the work was consolidated into one integrated main case, complemented by an exploratory logistics mock-up. This reduced the planned breadth but provided greater technical depth and enabled completion of the main deliverables.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.