Preparatory project ExSITE Mariestad - Excelling in the transition to sustainable construction SITEs
| Reference number | |
| Coordinator | Lindholmen Science Park AB |
| Funding from Vinnova | SEK 636 000 |
| Project duration | November 2026 - March 2027 |
| Status | Ongoing |
| Venture | Accelerate - FFI |
| Call | Accelera FFI preparatory project - autumn 2026 |
Purpose and goal
The construction sector must accelerate its climate transition through electrification, energy efficiency, and circular material management. A major industry challenge is system integration, getting solutions to collaborate seamlessly on an active site. The purpose of ExSITE is to demonstrate this holistic approach at scale in Mariestad. The goal is to develop an execution plan for a system demonstrator enabling a smart, fossil-free establishment, from groundwork to long-term urban planning.
Expected effects and result
The project results in a mobilised partnership and an execution plan for a large-scale system demonstrator. In the long term, the initiative builds new procurement competence and lowers barriers to sustainable tenders across both public and private sectors. By uniting electric machinery, smart energy management, and circular workflows, the climate impact is reduced while work environments improve establishing Sweden as an international role model for future emission-free industrial sites.
Planned approach and implementation
The project is structured as a feasibility study divided into four interconnected work packages: project management, system analysis, site analysis, and preparation of the execution plan. Coordinated by CLOSER, industry and public stakeholders collaborate closely. The methodology bridges strategic perspectives, such as technology, infrastructure, business models, and policy, with practical site conditions in Mariestad, using joint workshops to establish a robust framework.