Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

Power control of pilot signals for inter-cell interference cancellation

Reference number
Coordinator Ericsson AB
Funding from Vinnova SEK 100 000
Project duration January 2026 - June 2026
Status Completed
Venture 6G - Competence supply
Call 6G - Supervision of degree work

Important results from the project

The project met its main objectives. Different power control strategies were studied and compared, both analytically and through simulations. The project contributed to increased knowledge about power control and insights into design choices for simple heuristics.

Expected long term effects

The project demonstrated the importance of pilot power control for intercell interference suppression. The results can be used as input for standardization within 6G and future standards.

Approach and implementation

The project was carried out as a master thesis project at Ericsson and LiU. The problem was studied step by step in four different scenarios of increasing complexity, where the fourth scenario was the goal of the project. In order to keep to the schedule and simplify the calculations, simplifications were made in the signal models. The resulting thesis is of high quality and has been well received by all parties involved.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 17 July 2026

Reference number 2025-04383