PACE Preparatory Project – Promoting Accelerated Coach-System Electrification
| Reference number | |
| Coordinator | Lindholmen Science Park AB |
| Funding from Vinnova | SEK 900 000 |
| Project duration | November 2026 - September 2027 |
| Status | Ongoing |
| Venture | Accelerate - FFI |
| Call | Accelera FFI preparatory project - autumn 2026 |
Purpose and goal
The project aims to lay the foundation for a full-scale system demonstrator that addresses the entire system and removes the primary barriers to scaling up[cite: 5]. The objective is to mobilize a network of partners prepared to co-finance a full-scale system demonstration project and detail an implementation plan[cite: 6], enabling a broader roll-out of electric long-distance coach systems
Expected effects and result
PACE creates prerequisites for a subsequent main project to demonstrate economically viable operational solutions in real-world environments, remove barriers, and strengthen Swedish industrial competitiveness[cite: 6]. Impacts include higher system maturity[cite: 21], reduced emissions (approx. 6,000 tonnes CO2e/year per 80 electric coaches)[cite: 21], and an improved working environment
Planned approach and implementation
The consortium, consisting of Vy Buss, Hellbergs Buss, Volvo Technology (Volvo Buses), and Lindholmen Science Park, conducts the work across four work packages: WP1 mobilizes the stakeholder network and maps the partners´ objectives. WP2 maps critical system innovation needs based on five system perspectives. WP3 details technical and commercial concepts for concrete demonstrations. WP4 develops the implementation and financing plan for the main project.