OTS, -Object Tracer System
| Reference number | |
| Coordinator | NYLI KVALITETS- & KONTROLLTEKNIK AKTIEBOLAG | 
| Funding from Vinnova | SEK 100 000 | 
| Project duration | February 2011 - May 2011 | 
| Status | Completed | 
Important results from the project
Step 1. Pilot-study Target for the pilot study will be to compile technical material and data over possible technical solutions, based on existing science and development inside nano-and signalsystem range. Out of that a mapping and survey of technique and level of competence performed for the producing of an product . Timetable for the prototype to be manufactured will be calculated and included in the pilot study.