Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

NOVA - Novel Optimization of Vehicle Air-Pressure

Reference number
Coordinator Scania CV AB
Funding from Vinnova SEK 500 000
Project duration October 2026 - April 2027
Status Ongoing
Venture FFI ASP - Accelerated Startup Partnership: increased innovation collaboration between startups and need owner
Call FFI ASP - Accelerated Startup Partnership: increased innovation collaboration between startups and need owner - autumn 2026

Purpose and goal

The purpose of project NOVA is to develop and validate an autonomous wheel-end tyre-pressure optimisation system for heavy-duty trucks. The goal of the project is to develop a heavy-duty-truck-specific prototype and evaluate it through simulation and controlled testing. Both technical and commercial viability as well as the system´s possible impact will be evaluated.

Expected effects and result

The project is expected to result in the development of a prototype of an autonomous system for optimizing tire pressure, adapted for heavy trucks. The project will assess the system technically and commercially. It will also contribute knowledge about how the system can affect the truck´s energy consumption, tire wear and air leakage management. The results will be used to assess the continued development of the solution and possibilities for future application to heavy trucks.

Planned approach and implementation

WP1: Eligibility requirements and simulations: The parties define use cases for simulation, development and testing of the solution. The parties use simulation models to assess the requirements and the effects of the system. WP2: Prototype and controlled validation: Whilx develops and installs the tire solution on a truck. The parties conduct controlled tests. The goal is to identify areas where further development is needed and assess the overall feasibility of the solution.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 10 November 2026

Reference number 2026-03179