NordAmps usage of FAMES pilot line at VTT
| Reference number | |
| Coordinator | NordAmps AB |
| Funding from Vinnova | SEK 2 510 000 |
| Project duration | September 2026 - June 2027 |
| Status | Ongoing |
| Venture | Chips JU |
| Call | Chips JU: Testing and validation of new semiconductor technology in pilot lines |
Purpose and goal
The overall objective is to transfer the manufacturing process from a laboratory environment to the FAMES pilot line in Finland. The pilot line offers an industrially relevant manufacturing environment with established and quality-assured process flows, which allows validation, optimization and scale-up of the technology under conditions that enables future series production. Hereby, the technology´s path towards industrial implementation and commercialization is accelerated.
Expected effects and result
The project contributes to reduced dependence on critical materials and enabling high-performance components on a scalable silicon platform. The project will deliver: • Demonstrators of semiconductor components manufactured in the pilot line. • Documented process flows and manufacturing parameters. • Basis for further technology development to achieve higher volume production and commercialization. • Measured data from test and validation activities. • Increased technology rediness level.
Planned approach and implementation
The project consists of two parts: (1) Development and optimization of processes for gold patterning at wafer level. These structures will later act as catalysts for the subsequent nanowire growth at NordAmps. (2) Transfer, implementation, and demonstration of NordAmps´ complete vertical III-V MOSFET-process after nanowire growth in VTT´s pilot line environment. The goal is to establish a reproducible process flow at wafer level and collect manufacturing data.