Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

National Platform for Blockchain Innovation

Reference number
Coordinator Blockchain Sweden
Funding from Vinnova SEK 986 908
Project duration October 2025 - October 2026
Status Ongoing

Important results from the project

The project´s goals for the year were met, several with a margin. A baseline study with 51 survey responses and five interviews gave a first picture of how blockchain technology is used in Sweden and showed that the barriers are structural rather than technical. The project created new contacts with SIS, Finansinspektionen, AstraZeneca, Europeum-EDIC and DIGG. In October 2026 Finansinspektionen chose tokenised payments, the same area as the association´s proposal, for its Innovation Compass.

Expected long term effects

The project has strengthened Blockchain Sweden´s role as a convener between the blockchain industry, other sectors and public authorities. The baseline study informs an upcoming industry report and continued policy work. The dialogues with AstraZeneca and SIS show interest from other sectors, especially in traceability and standardisation, which may lead to pilots and joint applications. A seminar on the EU blockchain infrastructure EBSI is planned for January 2027.

Approach and implementation

Blockchain Sweden ran the project for one year, from October 2025 to October 2026. It started with a mapping through a survey and interviews, compiled in a baseline study. The results were shared through a webinar on standardisation, a roundtable on tokenisation, a knowledge session on traceability in pharmaceuticals, an event on EBSI and six newsletters. Operational project management changed hands in August 2026.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 16 November 2026

Reference number 2025-03712