Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

Nano-NMES ASIC for Venous Thromboembolism prevention

Reference number
Coordinator Roderinno AB
Funding from Vinnova SEK 3 974 940
Project duration September 2023 - January 2026
Status Completed
Venture The strategic innovation programme Electronic Components and Systems:
Call Electronic components & systems - research and innovation projects 2023

Important results from the project

Increased blood flow in the calf muscles significantly reduces the risk of blood clots / DVT. With miniaturized technology and skin-following electrodes, the project has achieved the goal of a small, wearable, ergonomic unit placed over the muscle that electrically stimulate the muscle to pump blood without discomfort for the user. To achieve this, a dedicated ASIC has been developed, a comfortable electrode-patch and its production method have been developed, as well as the UX and controller.

Expected long term effects

The project creates the conditions for a more accessible and preventive treatment of VTE, also outside the hospital environment. In the long term, the technology can contribute to reduced morbidity, lower burden on healthcare and reduced societal costs. The technical platform also has potential to be used in other medical technology areas and strengthens Swedish innovation and competitiveness internationally.

Approach and implementation

The project was carried out in close collaboration between technology, design and clinical parties with regular steering group meetings, digitally and physically at KTH, Karolinska and Roderinno. The development took place iteratively with close coordination between ASIC, hardware and patch design to ensure system integration. An external delay in ASIC manufacturing affected the schedule, but was managed through rescheduling. The collaboration worked well and the goals were essentially achieved.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 27 March 2026

Reference number 2023-00668