Miniaturization of disruptive electric motor concepts with extreme power density

Reference number
Coordinator Hagnesia AB
Funding from Vinnova SEK 960 500
Project duration October 2025 - July 2026
Status Completed
Venture Acceleration of deep tech companies

Important results from the project

The goals have been achieved. More than 10 customer meetings have been held and most of these have led to study visits and workshops that meet the project goals as well as Hagnesia´s commercial objectives. Two paid feasibility studies have been initiated. Several important processes and techno-economic process tools have been developed. Technical and market insights have been reached in discussions with customers. Steps towards a completely magnet-free motor variant have been taken.

Expected long term effects

The market that will be unlocked if Hagnesia can develop a smaller motor that is suitable for road vehicles is worth in the order of EUR 40 billion per year. This is as large as the market for wind turbines and motors for electrified ships. The effects on the Swedish/European economy would be very positive if we can establish Hagnesia as a Swedish/European industrial company and reach these markets. This project has provided very important insights and steps towards making this a reality.

Approach and implementation

The project was carried out according to plan through three main activities: customer dialogue and market validation, development of simulation and analysis tools, and evaluation of alternative motor concepts. The customer activities provided valuable feedback that was used to prioritize and adapt the technical work throughout the project. The project structure proved effective, and the project objectives were achieved within budget and the overall timeframe.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 September 2026

Reference number 2025-04088