Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

LIGNISET, fully bio-based lignin composites for sustainable infrastructure and construction: preparation of EIC Accelerator stage 2 proposal

Reference number
Coordinator Lignicore AB
Funding from Vinnova SEK 299 360
Project duration December 2025 - November 2026
Status Ongoing
Venture Global cooperation 2025
Call Planning grant for international proposal 2025

Important results from the project

The project´s objective was to develop a proposal to EIC Accelerator for LigniSet, a fully biobased lignin composite material. The goal was met, and LigniCore wrote the entire proposal in-house and submitted it in November 2026. Together with a pilot customer, a business model and pricing for temporary road signs were developed, which provides a basis for continued commercialization and funding.

Expected long term effects

The project is expected to eventually take LigniSet from the pilot phase to industrial production. Fully bio-based lignin composites can replace fossil-based plastics in, for example, road signs, outdoor furniture and facades. This reduces climate impact, gives higher value to lignin from the pulp industry and can strengthen Sweden´s position in bio-based materials.

Approach and implementation

The project was divided into work packages. It started with a digital workshop where the timeline was laid out, followed by work on the business plan and product strategy. During the spring, the focus was on collecting data and metrics from a pilot with temporary road signs and on mapping new product segments together with our production partner. The actual writing of the proposal began after the summer, with submission in November 2026.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 17 November 2026

Reference number 2025-04468