Important results from the project
The project´s analytical and identified objectives were met: obstacles and opportunities for electrified transport in port and industrial environments were mapped, a broad consortium was mobilized and a demonstrator concept was developed. However, the project did not lead to a joint proposal for a system demonstrator in Oxelösund. Instead, several parties have initiated bilateral collaborations to directly drive their electrification initiatives forward.
Expected long term effects
The project´s analyses and demonstrator concept constitute a knowledge base that is directly transferable to other ports, logistics hubs and mining environments in Sweden. The bilateral collaborations that have emerged are expected to lead to faster practical electrification of the port´s working machines and to a more integrated digital energy infrastructure. The lessons learned about stakeholder coordination will be taken forward to future demonstrator initiatives.
Approach and implementation
The project was worked on from June 2025 to February 2026 in four work packages: project management, mobilization of actors, technical analysis of the logistics and energy system, and development of a demonstrator concept. The work was carried out through workshops, bilateral meetings, and dissemination meetings with a broad consortium of industry, academia, energy actors, and the public sector. The schedule was largely followed.