Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

HolgerAI at MWC 2027: hardware-enforced safety for physical AI on industrial vehicles

Reference number
Coordinator HolgerAI AB
Funding from Vinnova SEK 40 000
Project duration November 2026 - March 2027
Status Ongoing
Venture 6G - Competence supply
Call Conference participation Mobile World Congress 2027

Purpose and goal

HolgerAI develops a retrofittable hardware gate for autonomous industrial vehicles: the drive signal is released only when both the AI and an independent safety system give permission. The purpose is to meet industrial connectivity providers, edge AI platforms, robotics companies and investors gathered in one place at Mobile World Congress 2027. Goals: several pre-booked meetings, three qualified follow-ups and a selected reference architecture for connecting retrofitted vehicle fleets.

Expected effects and result

HolgerAI moves from a Swedish company with patent-pending technology and a demonstrator to a company with a mapped industrial connectivity ecosystem, verified integration requirements towards AI platforms and an international contact base ahead of fundraising. A market report on how safety functions are built into autonomous industrial vehicles will steer the requirements for the next product version. The project strengthens Swedish presence in physical AI.

Planned approach and implementation

November 2026 to February 2027: meetings are pre-booked through the MWC meeting platform and technical material is prepared in English. During the event, 1 to 4 March 2027: meetings with connectivity and AI platform providers, investor meetings at 4YFN, conference sessions on physical AI, robotics and regulation, and Team Sweden activities at Vinnova´s request. March 2027: all meetings are followed up within ten days and results are compiled in a market report.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 16 November 2026

Reference number 2026-02633