Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

FUSION: Flexible Utilization of Seamless Integrated Smart Infrastructure For Optimized ENergy in Buildings

Reference number
Coordinator Kungliga Tekniska Högskolan - Kungliga Tekniska Högskolan Skolan f arkitektur & samhällsbyggn
Funding from Vinnova SEK 288 950
Project duration June 2025 - February 2026
Status Completed
Venture Global cooperation 2025
Call Planning grant for international proposal 2025

Important results from the project

The planning project is structured as an intensive 10-month process with resource allocations from Kungliga Tekniska Högskolan and MG Sustainable Engineering AB. It focuses on developing a strong project concept, building a qualified international consortium, and preparing a competitive proposal for the Horizon Europe call. Activities include concept development, partner mobilization, pre-feasibility studies, and full proposal drafting.

Expected long term effects

Strengthen cooperation between international partners for future joint EU projects. Through the expanded network and the collected experiences, the opportunities to apply for and implement new projects increase. This will lead to increased innovation capacity, technological development and more efficient solutions in sustainable energy. In the long term, the project will contribute to a stronger position in the market, increased competitiveness and increased cooperation within the EU.

Approach and implementation

The project was implemented according to plan. The partners carried out all activities include concept development, partner mobilization, pre-feasibility studies, and full proposal drafting. The work in the planning project was structured into three work packages, covering coordination, project structuring, and proposal writing and submission, ensuring alignment with criteria on excellence, impact, and implementation sections.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 3 April 2026

Reference number 2025-01536