Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

Evolo - Modular, low signature electric hydrofoiling drone

Reference number
Coordinator Sailport AB
Funding from Vinnova SEK 6 042 000
Project duration October 2026 - October 2027
Status Ongoing
Venture Civil-military synergies
Call Needs-driven defense innovation for a secure Baltic Sea region

Purpose and goal

The project aims to develop, build and field test an electric, autonomous hydrofoil vessel (USV) for surveillance and situational awareness in the coastal and archipelago environment of the Baltic Sea. The goal is an integrated demonstrator with verified performance in terms of speed, seaworthiness, range and acoustic signature, based on technology from the Evolo program at KTH.

Expected effects and result

The project is expected to deliver a field-tested demonstrator in which hydrofoils, a control system with radar-based height measurement, direct-drive electric propulsion and a modular composite hull work as one system. The results provide documented performance and a basis for further development towards defence requirements. In the longer term, a new class of fast, quiet and energy-efficient uncrewed vessels can strengthen surveillance of coasts and critical infrastructure.

Planned approach and implementation

The project runs for twelve months and is carried out by three SMEs: Sailport AB (coordinator, control and performance), Zparq AB (electric propulsion and energy system) and Aston Harald Composite AB (hull and composite structures). The work is divided into seven work packages and is carried out iteratively through modelling, simulation, design and stepwise integration. Field tests of gradually increasing difficulty are carried out during the final months.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 9 November 2026

Reference number 2026-01668