Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Consumption OptimizatioN in VIdeo NEtworks

Reference number
Coordinator Blekinge tekniska högskola
Funding from Vinnova SEK 2 400 000
Project duration September 2014 - September 2017
Status Completed
Venture Eureka cluster co-funding 

Purpose and goal

The project Celtic-Plus CONVINcE is about developing solutions to reduce the power consumption in IP-based video networks with an end-to-end approach, from the Head End where video contents are encoded and streamed, further to wide area network, edge cloud and finally to terminals where they are consumed, also embracing Content Delivery Networks (CDN). The targeted parameters are minimum end-to-end energy consumption combined with maximum possible Quality of Experience (QoE) obtained at end-user. The project goals have been reached, as indicated by the evaluation committee.

Expected results and effects

The goals of the project, as described in the Project Proposal, have been reached. A number of 41 Deliverable documents and 33 Milestone documents have been produced. These documents cover a number of 7 Work Packages. The project results have been presented and evaluated by the CELTIC-Plus evaluation committee at the project meeting held at Orange, Paris on September 21, 2017. The evaluation was very positive, with a recommendation that the project participants do continue their cooperation even after the end of the project, eventually under the umbrella of a new project.

Planned approach and implementation

The project Celtic-Plus CONVINcE has a number of 7 Work Packages dedicated to different elements of the video distribution system, as follows: WP1 - Architectures, power optimisation and business case; WP2 - Power saving in the Head End; WP3 - Power saving in the Network; WP4 - Power saving in the Terminal; WP5 - Tools and demonstrators; WP6 - Dissemination and exploitation; WP7 - Management. A number of 41 Deliverable documents and 33 Milestone documents have been produced. The project results have been accepted by the Celtic-Plus evaluation committee.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 8 January 2019

Reference number 2014-00218

Page statistics