DuaFLO® BioPump for the Production of Biopharmaceuticals by High Cell Density Perfusion Cultivation at CETEG

Reference number
Coordinator Ventri Labs AB
Funding from Vinnova SEK 1 000 000
Project duration November 2026 - December 2027
Status Ongoing
Venture Research infrastructure - utilisation and collaboration
Call Support to small and medium-sized companies for the use of life science infrastructure

Purpose and goal

The project will test and validate VentriLabs´ DuaFLO® BioPump in an industrially relevant environment, through high cell density perfusion cultivation at CETEG, KTH. Pump performance is compared with established pump technologies used in the industry today. The goal is to generate independent data showing that DuaFLO® is ready for commercial use, produced by an academic infrastructure with long experience of perfusion processes.

Expected effects and result

The project will generate independent data on cell growth, viability and productivity when DuaFLO® is used in perfusion cultivation of mammalian cells. Validation at an established academic infrastructure strengthens the credibility of the technology ahead of market introduction. The results will guide the next phase of product development towards industrial scale. Over time, gentler pumping can support more efficient biologics manufacturing and lower cost per patient.

Planned approach and implementation

The project runs from November 2026 to December 2027 in three work packages. In WP1, VentriLabs and CETEG define the test protocol, select cell lines and prepare the equipment. In WP2, CETEG runs perfusion cultivations where DuaFLO® is tested and evaluated against a reference pump under industrially relevant conditions. WP3 covers data analysis and a test report. Joint reviews are held at start, midpoint and end.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 4 November 2026

Reference number 2026-02975