| Reference number | |
| Coordinator | RISE Research Institutes of Sweden AB - Bioekonomi |
| Funding from Vinnova | SEK 2 338 282 |
| Project duration | November 2024 - August 2026 |
| Status | Ongoing |
| Venture | The strategic innovation program InfraSweden |
| Call | SIP InfraSweden: Increased circularity for the transport infrastructure, call for proposals 2 |
Important results from the project
Expected results were an assessment of how investigated alternative, circular materials work for winter road operation in Stockholm municipality. This goal was achieved by testing potassium formate and circular salt in the lab and the former also in the field on cycle paths. The tests showed equivalent or in some investigated situations better function, which provides the conditions for continued trials or use in regular operation.
Expected long term effects
In the long term, the range of anti-icing agents can be broadened based on local needs, where both circularity and care for vegetation can be met without sacrificing accessibility and safety for unprotected road users.
Approach and implementation
The project was carried out according to plan as part screening and laboratory evaluation and part pilot study. These ran partly in parallel. Field studies were carried out on a large scale in both winter season 1 and winter season 2 with winter road operation of cycle paths. Greater emphasis than planned was placed on production process development and laboratory evaluation for one of the materials, while the field trials focused on the material that was available in sufficient quantities.