Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Our e-services for applications, projects and assessments close on Thursday 26 November at 4:30pm because of system upgrades. We expect to open them again on Friday 27 November at 8am the latest. 

Bioregional Design Methodology South - developing and testing place-based architectural design with local circular building resources

Reference number
Coordinator Sustainable Innovation i Sverige AB
Funding from Vinnova SEK 1 998 391
Project duration November 2026 - October 2028
Status Ongoing
Venture 2026-01505-en
Call Collaborative projects for healthy and resilient communities

Purpose and goal

The project will develop and test a bioregional design methodology that makes the region´s local, circular building resources the starting point for design. The methodology will take the resources from mapped potential to actual decisions in planning and construction, and make the consequences of material choices comparable along the value chain.

Expected effects and result

The project results in a proven bioregional design methodology, an openly available Bioregional Gestaltningsmanual Syd, mapping of regional material suppliers and a further developed Material Map. In the long term, more construction projects are expected to use local circular construction resources, which reduces climate impact, strengthens regional value chains and reduces vulnerability to global disruptions. The methodology can also be used in other bioregions.

Planned approach and implementation

The project will last 24 months and will be implemented in four work packages. AP1 includes project management and coordination. I AP2 maps the bioregion´s material producers and suppliers, and knowledge is built through seminars and study visits with the value chain´s actors. I AP3 develops design principles and a value chain-based impact analysis iteratively and tests them in a sharp planning or building permit situation in the city of Malmö.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 17 November 2026

Reference number 2026-02519