Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Automation of Network edge Infrastructure & Applications with aRtificiAl intelligence

Reference number
Coordinator Ericsson AB - Ericsson Research
Funding from Vinnova SEK 28 998 567
Project duration June 2020 - February 2024
Status Completed
Venture Eureka cluster co-funding 

Important results from the project

The ANIARA project goal of "accelerating digital transformation by the efficient use of a highly integrated and flexible edge infrastructure that is programmable across all its components, from the basic connectivity setup to fully virtualized network functions and application components" turned out to be spot on to complement the evolution of 5G with crucial technical enablers towards an intelligent and sustainable 6G platform. The project results contributed to this goal with developing compute and AI enablers for future mobile networks.

Expected long term effects

The project contributed to a sustainable and intelligent 6G network platform with the following: a) Energy efficient edge infrastructure; b) Automated management of the distributed platform, which includes both resource orchestration for distributed edge resources as well as intelligence support for 6G network functions; and c) 6G platform services on the edge exposed for society, enterprise, and industrial applications.

Approach and implementation

The planned deliverables were produced according to the initial plan. The results will be presented three times during the project in mid term and final reviews. Several joint works have ben done including Swedish and non Swedish organizations. Several workshops and consortium meetings have been organized to accomodate this collaborations and the results have been captured in several demos, product, paetnsts and publications.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 24 May 2024

Reference number 2020-00763