Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Assignment to analyze Sweden´s innovation and production capacity for vaccines and other biological drugs

Reference number
Coordinator RISE Research Institutes of Sweden AB - RISE Affärs- och Innovationsområde Hälsa och Life Science
Funding from Vinnova SEK 2 558 778
Project duration January 2021 - April 2021
Status Completed

Purpose and goal

The aim of the project was to; 1) generate a knowledge base report including an inventory of capabilities and competence related to vaccine production in Sweden 2) to map specific private and public investments within vaccine production in European countries similar to Sweden and how these have been influences by government support 3) identify and describe synergies with production of other biologicals. The project has delivered all goals and in addition generated a public report, available on the Vinnova web page.

Expected results and effects

The report forms a base for decision makers for future directions and investments. It describes the complexity, challenges, and possibilities within the area, an inventory, and evaluation of infrastructure, capacity, capability, and resilience in an international perspective. It is expected to contribute to development of fact-based strategies. The overall goal is for Sweden to become more attractive for vaccine production, with excellence and capacity within advanced process development and biologicals based on a strong industry sector and basic research.

Planned approach and implementation

The steering group had links to all involved organisations. RISE was responsible for project management and most of the project work and coordination. Business Sweden was responsible for the international mapping. Knowledge building, mapping and interpretation of results were performed within different work packages (WPs). To efficiently collect information from different stake holders, the draft report was sent out with a connected survey. The project period was tight, all WPs were performed in parallel. More time for planning, analysis and scenarios would have been optimal.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 25 August 2021

Reference number 2021-00983

Page statistics