Important results from the project
Expected long term effects
Approach and implementation
The project was implemented in four work packages: Work package 1 Coordination Contact with the Swedish Armed Forces established. The collaboration is planned to continue even after the CMIP project is completed. Work package 2 Implementation Methodology and software has been demonstrated by developing a spare part. Work package 3 Software Software has been modified to be able to be used completely "off-grid". Work package 4 Verification Prototype has been manufactured and demonstrated.