8513, BioSNG+ , Catator

Reference number
Coordinator Catator AB
Funding from Vinnova SEK 3 877 694
Project duration July 2025 - June 2028
Status Ongoing
Venture Eurostars

Purpose and goal

Med BioSNG+ we want to develop a new catalytic technology for decentralized applications to convert green CO2 into green biomethane. The core innovation is a new reactor concept based on a catalytic heat exchanger. Currently, biomethane is separated from biogas (60 vol% CH4, 40 vol% CO2) and injected into the gas grid. A complete conversion of carbon dioxide to methane will make the use of biogas more economically competitive and also increase green methane production by 40%.

Expected effects and result

The goal is to convert 40% of the CO2 in a biogas to Biomethane and thereby be able to increase the total production of biogas in a biogas plant from approximately 60% to >97%.

Planned approach and implementation

A detailed project plan can be found in the project application. The design studies have now started and the first Kick-off meeting between the parties is on July 17th.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 3 August 2026

Reference number 2025-01743