Reducing traffic disruptions and damage to track and vehicles through improved regulations and procedures

Reference number
Coordinator Chalmers Tekniska Högskola AB - Chalmers Tekniska Högskola Inst f Mekanik & Maritima Vetenskap
Funding from Vinnova SEK 1 219 400
Project duration July 2023 - June 2026
Status Completed
Venture Innovations for sustainable mobility
Call Innovations for sustainable mobility - For a climate-neutral future - spring 2023

Important results from the project

The project exceeded its objectives by improving methods for measuring dynamic wheel loads and developing recommendations for risk-based wheel damage management. Key outcomes included revised wheel inspection routines after wheel damage that save more than 50 MSEK annually and a crack growth code, partly developed within the project, that enabled traffic to resume after the Iron Ore Line derailment. With disruption costs exceeding 100 MSEK per day, the benefits far outweigh the project budget.

Expected long term effects

The project outcome will support a more robust and cost-effective railway system through risk-based management of wheel defects, improved regulations, and more efficient maintenance. Expected benefits include fewer unnecessary traffic disruptions, lower maintenance costs, improved reliability, and better infrastructure protection. The developed methods also support predictive maintenance and have potential for wider national and international adoption.

Approach and implementation

The project was completed on schedule, with all four work packages successfully delivered. Through strong collaboration and the high level of expertise among the partners, all objectives were achieved. Despite limited funding covering only part of the work, the project generated results with significant practical value, substantial socio-economic benefits, and strong potential for long-term implementation.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 10 August 2026

Reference number 2023-01218