Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Zentnl LWP for Canadian Mining

Reference number
Coordinator WAVR International AB
Funding from Vinnova SEK 25 000
Project duration October 2025 - April 2026
Status Ongoing

Purpose and goal

Purpose: Use PDAC 2026 for an exploratory market and needs assessment of Zentnl LWP in Canadian mining and to prepare pilots. Goals: 15–20 curated meetings, 2–3 LoIs/MoUs with mine operators/integrators, 1–2 pilot one-pagers (KPIs, integration, timeline), and a post-PDAC action plan. The outcome paves the way for safer, more sustainable operations and stronger international competitiveness for Swedish mining tech.

Expected effects and result

15–20 documented meetings. 2–3 LoIs/MoUs with mine operators/integrators. 1–2 pilot one-pagers (site, KPIs, data integration, timeline, budget). Map of IT/C2 integration paths and prioritized partner/customer list. Post-PDAC action plan with owners and milestones. Refined value proposition for the Canadian mining market.

Planned approach and implementation

Plan: Preparation (Oct–Feb): build a pre-booked agenda with 15–20 1:1 meetings (miners/integrators) and materials (pitch deck, demo, pilot one-pager). With the Canadian Trade Commissioner in Sweden we secure meetings and pitch slots. Delivery (PDAC Mar 1–4, Toronto): pitch + 1:1s. Follow-up (Mar–Apr): convert to 2–3 LoIs/MoUs and 1–2 pilot scopes.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 10 October 2025

Reference number 2025-04018