New concept for efficient combined tranportation

Reference number
Coordinator TRUCTRIC AB
Funding from Vinnova SEK 739 000
Project duration November 2025 - August 2026
Status Ongoing
Venture Accelerate - FFI
Call Accelera FFI preparatory project - fall 2025

Purpose and goal

The aim of the project is to prepare a full-scale system demonstration of a new concept for combined transports with horizontal transshipments of semi-trailers, "Assisted RoRo Transshipments”. The objectives of the project are - to develop a suitable railway wagon configuration, - to create a virtual system demonstration, and - to prepare a project plan for implementing a full-scale system demonstration.

Expected effects and result

Implementation of the system is expected to lead to faster electrification of long-distance transportation at lower energy consumption. The preparatory project is expected to provide a good basis for a full-scale demonstrator in a combined transport shuttle with - an evaluated first virtual demonstration, - reduced critical technical uncertainties related to railway wagon configurations, and - an implementation plan, including proposed activities, geographical locations and actors.

Planned approach and implementation

The project is implemented in three work packages: WP 1 - Virtual system demonstration; WP2 - Preparation of railway wagon; and WP 3 - Planning and preparation for system demonstrator. In WP 1 an animated virtual demonstrator is developed through animation. In WP 2 a basic railway wagon configuration is developed and decide. A first demonstrating model of the wagon is created. In WP 3 local conditions are investigated, after which an updated project plan is created.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 24 November 2025

Reference number 2025-04130