Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Accelerate electrification of forestry transport

Reference number
Coordinator Stift Skogsbrukets Forskningsinstitut Skogfor - Skogforsk - Stiftelsen skogsbrukets forskningsinstitut
Funding from Vinnova SEK 500 000
Project duration March 2023 - September 2023
Status Completed
Venture Accelerate - FFI
Call Accelerate the transition to sustainable road transport - autumn 2022
End-of-project report 2023-00046svenska.pdf(pdf, 706 kB) (In Swedish)

Important results from the project

The project has fulfilled its objective to: - identify barriers and opportunities for efficient scaling up of electrification of forestry road transport, - develop a concept for a system demonstration, - establish a network and a collaboration platform.

Expected long term effects

The project identified barriers in: technology and vehicles (the technology is still unproven in the challenging environments of forestry); business models; planning; access to electricity and charging; system understanding and understanding of the impact of external factors. The most important opportunities identified are freedom from fossil fuels, better operating economics, and the possibility of being self-sufficient in energy. The project has led to the initiation of industry collaboration to overcome these barriers.

Approach and implementation

In the project, workshops, interviews and a literature study were carried out. Calculations of energy and power demand were made, and a simulation model for calculating the demand for power at potential charging points was made.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 3 October 2023

Reference number 2023-00046