XR-TBP Scalable industrial XR trainings environments for battery production

Reference number
Coordinator Chalmers Tekniska Högskola AB - Chalmers Tekniska Högskola Inst f Industri- & materialvetensk
Funding from Vinnova SEK 1 000 000
Project duration March 2025 - February 2026
Status Completed
Venture Emerging technology solutions
Call Innovative collaborations with the USA within XR - step 2

Important results from the project

The goals have been achieved! A scalable solution for XR-based training and instruction has been developed. The solution is LLM-based and can, together with an Digital Twin, generate dynamic XR instructions and interactions in real time. A framework for the solution, based on the existing standard ISO 23247 for Digital Twins, has been developed and verified in a demonstrator implemented on site in USA. The results have been submitted for publication to Winter Simulation Conference in 2026.

Expected long term effects

The project is expected to increase the availability of XR-based training in industry through more scalable solutions. This contributes to a wider spread of XR and improved competence among production personnel, which strengthens the competitiveness of the industry. The developed framework of the solution is based on ISO 23247, which enables further commercial development. Continued knowledge exchange with American partners is also expected which could trengthen Swedish XR-research.

Approach and implementation

The project began with the platform, licenses and training materials being shared by the American partner. The design of the solution then took place with participants at Chalmers, where information was obtained and quick proofs of concepts were created to iterativly test the solution. A final phase of three weeks was spent in the USA at the intended research institute, where the developed solution was implemented in a demonstrator together with a research group at the American institute.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 10 April 2026

Reference number 2025-00191