Sustainable slag fluxing in AOD process (HASAOD)

Reference number
Coordinator Kungliga Tekniska Högskolan - Kungliga Tekniska Högskolan Inst f materialvetenskap
Funding from Vinnova SEK 999 189
Project duration October 2024 - June 2025
Status Completed
Venture Impact Innovation Metals & Minerals - Program-specific efforts Vinnova
Call Impact Innovation: Feasibility studies within Technological Action Areas in the program Metals & Minerals

Important results from the project

The goals set out from the start of this project were mostly fulfilled. Industrial AOD trials carried out at Outokompu and Alleima have proven preliminary success of reducing flourspar consumption by 70% during a 304 heat and 100% in a SAF2507 heat. Thermodynamic calculation shows that flourspar-free steelmaking is theoretically possible provided that the type and the amount of flux added is well matched with the SiO2 and Al2O3 contents in the slag.

Expected long term effects

This project is the first step to enable Swedish stainless steel producers to transition towards flourspar-free AOD process, which will enhance their raw material resilience in the long run should the price, quality, and availability of flourspar becomes uncertain in the future. There may be other side benefits such as the prolonging of the refractory lifetime and more convenient post-processing and valorization of the AOD slags.

Approach and implementation

The project consisted of 4 work package, which includes project management and dissemination (WP1), industrial trials and thermodynamic investigation (WP2), experimental investigations (WP3), and economy and sustainability evaluations (WP4). The project progressed smoothly according to the schedule except that some of the sampling of slag and steel in WP2 was completed a little later than planned but this did not have a major impact on the project deliverables.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 5 September 2025